Training Resources
Early Years
S1 - Poorly Child |
S2 - Preparing and Storing Food |
S3 - Behaviour Management |
S4 - Getting to Know You |
S5 - Ofsted Learning Walk |
S6 - Pre-session Risk Assessment |
M1 - Introduction |
M2 - Physical Abuse |
M3 - Sexual Abuse |
M4 - Emotional Abuse |
M5 - Neglect |
M6 - Responding to Concerns |
M7 - Information Sharing and Record Keeping |
Nursing (Virtual Frontline)
M1 - Systemic Approach to Assessment |
M2 - Airway |
M3 - Breathing |
M4 - Circulation |
M5 - Disability |
M6 - Everything Else |
M7 - COVID19 |
S1 - Infectious Disease |
Health & Social Care
S1 - Healthcare Support Worker Patient Observations |
S2 - Assistant / Registered Practitioner Post Operative Observations |
S3 - Domiciliary Carer Service User Home Visit |
S8 - End of Life Care |
Electric Vehicle Charging Point Installation
S1 - Domestic Installation Guide |
S2 - Domestic Installation |
S3 - Commercial Installation |
Plumbing and Gas
S1 - Planning and Design of Pipework |
S2 - Installation of an Unvented Hot Water Cylinder |
S3 – Commissioning a Condensing Boiler |
S4 – Fault Finding a Central Heating System |
Construction - Bricklaying
M1 - Getting Started |
M2 - Materials |
M3 - Setting Out |
M4 - Building Below Ground Level |
M5 - Building Above Ground Level |
M6 - End Test |
S1 - Building to DPC Level |
Construction - Carpentry
M1 - Getting Started |
M2 - Tools & Materials |
M3 - Carpentry Below Ground (Substructure) |
M4 - Carpentry Above Ground (Superstructure/First Fix) |
M5 - Finishes (Second Fix) |
M6 - End Test |
S1 - Fit W Truss Roof and External Door |
Construction - Plastering
M1 - Getting Started |
M2 - Backgrounds |
M3 - Materials |
M4 - External Rendering |
M5 - Internal Plastering |
M6 - End Test |
S1 - Prepare and Plaster Walls of a Room |
Renewable Energy - Heat Pumps
M1 - Overview and Considerations |
M2 - Health and Safety |
M3 - Heat Pump Types |
M4 - Ground Source Collectors |
M5 - Air Source Collectors |
M6 - System Design |
M7 - Installation |
M8 - Testing, Commissioning and Handover |
S1 - System Installation |
S2 - System Commission and Handover |
Retrofit
S1 - Introduction to Retrofit |
S2 - Assessment of a Property |
S3 - Design of a Bungalow |
S4 - Design of a Terraced House |
S5 - Installation of Fabric Measures |
S6 - Installation of Building Services |